Blog/New construction
Schedule the 11th-month warranty inspection before coverage ends
September 24, 2026 · 8 min read · Golden Scope Inspections

The first year is your documentation window
Most builder warranties split coverage into more than one clock. Workmanship items are often the ones that end around the first anniversary. Systems and structure may last longer, and the only way to know which is which is to read the warranty you received at closing. After the workmanship window closes, drywall cracks, nail pops, door adjustments, and some leaks become your cost unless another part of the warranty still applies.
An inspection around the eleventh month gives you a written list while the builder is still obligated to look at those items. Waiting until the anniversary week usually means the warranty desk is scheduling into the period after coverage has ended. Book earlier than feels necessary. The visit, the report, their walkthrough, and any return trip all take calendar days you do not get back.
A builder’s own courtesy walkthrough is not the same document. Their superintendent works for the company that built the house. A third-party inspection does not force a repair by itself. It gives you photos and descriptions with a date, which is what you need if the first answer is no.
What the first Houston year does to a new house
New houses here meet a cooling season, high humidity, and at least one hard rain before the warranty anniversary. Lumber dries. Slabs experience their first real summer on clay. Nail pops, a hairline crack at a window, and a door that needs the strike adjusted are common. Those items are reasonable warranty conversations. They are not, by themselves, evidence that the foundation has failed.
The items that should not wait look different. A bath fan duct lying in the insulation, a condensate line that drains into the attic, flashing pulled loose where a roof meets a wall, and a downspout that empties on the porch slab are unfinished work. So is a GFCI that does not trip, a garage-door sensor that does not reverse the door, or an exterior door you can see daylight through.
Humidity will find the gaps the punch list missed. If a room never cools, the air handler and the duct connections are worth a careful look before you assume the system is simply “new-house warm.” If a window sweats constantly, note the room. An inspection that includes the list you have lived with is more useful than one that only follows a blank checklist.
What we look for when the house is already finished
We operate doors and windows, check visible roof and flashing conditions, run plumbing fixtures, and look at the electrical panel, cooling operation, and drainage away from the slab. Cosmetic paint touch-ups matter less than items that let water in, affect safety, or show the house was not finished the way the plans described.
Some defects are already hidden. A shower pan that was never tested, or a vapor barrier that was not lapped before the slab was poured, is harder to see after tile and carpet. That is why phase inspections exist during construction: before the concrete, while the framing and systems are still open, and again at the end. If those visits were missed, the eleventh-month inspection is still worth doing. It is the safety net, not a time machine.
Storm damage during the first year is not automatically a warranty item. Wind and hail are often insurance questions. The inspection can still document what is visible now, so you are not guessing later which dent was there when you moved in.
Send one clear request
Send one message with the report attached and a short numbered list. Each line should name the room, the condition, and the photo. “Primary bath, soft flooring at the tub, photo 14” is easier to assign than a paragraph about disappointment. The warranty office routes work to trades. A clear location gets a person to the right room.
Keep their replies. If they mark an item as homeowner maintenance, you still have the date and the photo. If they deny an item, ask which section of the warranty they are using. Some denials match the contract. Some are a trade that does not want to return. Your report does not override the warranty. It describes the condition when you asked.
When they say a repair is complete, look at it. Fresh caulk in a texted photo is not the same as a window that now latches or a fan that now exhausts outdoors. Do not sign a completion form for a room you have not checked.
A timeline that survives a busy warranty desk
Around month nine, read the warranty and walk the house yourself. Write down rooms that run warm, windows that stick, and places where water stands after rain. Around month ten, book the inspection and send that list ahead of the visit. Around month eleven, send the numbered request and get their visit on the calendar before the anniversary.
Do not wait for them to offer the walkthrough. Those visits are short. If a tropical storm or a run of heavy rain happens during this window, walk the house again after the weather and add anything new before you send the list. Drainage problems are easier to show when the ground is still wet.
Keep the report with the warranty book and the closing papers. The next owner, and any later insurance conversation, will ask what you knew and when you asked the builder to address it. A dated file is the whole point of doing this before the clock runs out.
Make your own list before the appointment. Walk each room after a rain and again on a hot afternoon. Write down windows that stick, rooms that never catch up with the thermostat, outlets that do not work, and any place the floor feels soft. Look in the attic if you can do it safely. A bath-fan duct that stops in the insulation, daylight at a roof penetration, and a condensate line that does not reach a drain are items a finished house can still show. Your list keeps a lived-in problem from being skipped because it was quiet for the hour we were there.
Houston grading belongs on that list. New lots are often flat, and the swale that was supposed to carry water to the street is easy to erase with a flower bed or a fence. After a hard rain, walk the perimeter. Water standing against the slab, a downspout emptying into mulch, and soil that slopes back toward the brick are conditions you can point to with a photo. They also keep the edge of a clay lot wet while the rest of the yard dries, which is the pattern that shows up later as a stuck door. A hairline crack by itself is common in a first-year house. A crack on the same wall that holds water is a clearer request.
Cooling equipment in a new house still needs a real look. Listen for the condensate pump if one is installed, and see whether supply air reaches the rooms that feel warm. A clogged condensate line is a common way a new ceiling gets its first stain. A filter left with the airflow blocked, or a return grille covered by furniture, will make a new system look weak. Note those conditions. They are small, and they are the items a warranty desk can dismiss when they are not written down with a room name.
Test ground-fault protection at the kitchen, the baths, the garage, and the outdoor receptacles. Run water at each fixture long enough to look under the sink and at the tub. A loose supply stop or a drain that was never tightened shows itself then, not during a short builder walkthrough. Garage-door sensors that fail to reverse the door, missing smoke alarms, and a water-heater pan or discharge pipe that was never finished are safety items. Put them on the numbered list even when they feel small next to a roof stain.
Keep the request factual. The warranty desk is matching your note to a trade and to a section of the warranty you were given. Name the room, the component, and what it is doing. You do not need to argue that the whole house was built poorly. If the concern is the slab, describe the doors, the cracks, and any elevation information you have, and ask which section of the warranty applies. Workmanship coverage and structural coverage are often different clocks. Reading your own warranty before you send the letter keeps a foundation question from being filed as a paint item.
Phase inspections during construction are the better time to see open framing, the vapor retarder before a slab is poured, and the rough plumbing before a tub is set. If you are still early in a build, schedule those visits while the work is visible. If you are already near the end of the first year, use the inspection you can still get. Document the attic, the panel, the drainage, and the cooling system, send one list, and keep every reply. That file is what you have if the anniversary passes and an item is still open.
Next step
Ready for a closer look?
Book a 11th-month warranty inspection or call (832) 833-2863. Reports are delivered within 24 hours.
More from the blog
- How to prepare a Houston home for inspection day
October 8, 2026
- Why Houston sellers inspect before they list
October 2, 2026